Tram Huangpu Line 1 | China
train-detectionChina

Tram Huangpu Line 1 | China

Operator
Young Tram
Country
China
Partner
CRSC Xi’an
Segment
Urban
Application
Track Vacancy Detection
Products
RSR180, FAdC®
Protocols
Proprietary protocols
Year
2019

Tram Huangpu Line 1 (HP1) line is located in urban areas with high traffic density and passenger volume as well as many level crossings. The adverse weather conditions can cause flooding of the track bed and add to the challenges for reliable system availability and operations. To provide safe and efficient wheel detection on this line, the Frauscher Advanced Counter FAdC®was installed and customised according to the Chinese Ministry of Railways Railway Safety Communication Protocol RSSP-1.

Tram Huangpu Line 1 (HP1) is the first tram line in Huangpu District of Guangzhou, which stretches 14,4 kilometers from Xiangxue Station to Xinfeng Station with a total of 20 stations and can support trams running at a maximum speed of 70 km/h.

The line is located in urban areas with high traffic density and passenger volume as well as many level crossings. The adverse weather conditions in Guangzhou, including heavy rain, typhoons and high humidity levels, can subsequently cause flooding of the track bed which may affect operation.

To ensure smooth operation in harsh conditions like floods, the IP68 rated Wheel Sensor RSR180 was installed in combination with the Frauscher Advanced Counter FAdC®. As the FAdC® can be configured with a customised protocol, it was decided to implement the Railway Signal Safety Protocol RSSP-I protocol–Type I of RSSP, which is introduced as Chinese standard by China’s Ministry of Railways. In close collaboration of CRSC Xi’an Railway Signal Co., Ltd. (CRSC Xi’an) and CRSC Research & Design Institute Group Co., Ltd. (CRSCD) together with Frauscher, the RSSP-implemented FAdC® product was provided for the ­first time with an efficient and customised service. The COM-RSSP has been given the CENELEC SIL 4 certification in March 2021.

High availability

The RSR180 is not impacted by environmental conditions such as flooding, snow or severe temperatures.

Customised interface

The software interface of the FAdC® can be conf­igured with the Frauscher Safe Ethernet FSE protocol or other customised protocols. Both Chinese and Austrian Frauscher teams worked together closely with the customer to provide the RSSP-implemented FAdC® solution with an efficient and customised service.

Increasing system availability

The implementation of the Supervisor Track Section STS functions takes negative effects such as lightning into account, reducing the costs and times of maintenance. Moreover, the STS can be integrated into a modern efficient interlocking system so that the troubleshooting and component replacement can be carried out simultaneously, saving time for operators.

Similar Projects
This might also interest you
1/5
train-detectionTaiwan

Shalun Signaling | Taiwan

The Shalun Line is frequented by four-car-trains and located in the south of Taiwan. Tropical conditions with temperatures between 22 and 28 degrees and high humidity are not the only challenge the Frauscher Axle Counter Solution has to deal with.
servicesAustria

Salzburger Lokalbahn | Austria

Frauscher supported the Salzburger Lokalbahn, a regional railway in Austria, with a service assignment that included both the maintenance of Frauscher wheel sensors and axle counters as well as hands-on training for the installation personnel. The customer benefited from efficient troubleshooting and tailored training delivered directly on their own equipment.
train-detectionIndia

Vijayawada – Gannavaram Rail Line | India

The Vijayawada – Gannavaram rail line belongs to South Central Railway and is situated in Andhra Pradesh. Initially, the line featured a conventional signalling system and there was a requirement by the operator to update this into an automatic signalling system with the Frauscher Advanced Counter FAdC®.
train-detectionFrance

Homologation for the Île-de-France tramway network | France

The network of Île-de-France tramways in the region of Paris has been a showcase model of public transport since the line T1 opened in 1992. Over a million passengers use these trams daily and today, the system consists of 11 lines covering over 100 kilometres of track. Over the next years it is planned to expand this network even further. For track vacancy detection, the Frauscher axle counting system is considered as being the ideal solution for this comprehensive network.
train-detectionAustria

GKB Graz-Köflacher Bahn | Austria

The operator of the Graz-Köflach line has made substantial modernisations to the network, choosing a decentralised system architecture and the EULYNX standardised interface. In this case, it was crucial that the new system would ensure a seamless transition from the previous parallel interface for relay systems to EULYNX.