Frauscher Sensor Technology has completed the divestiture to Wabtec Corporation.

Find Out More
Kokkola | Finland
Train DetectionFinland

Kokkola

Operator
Finnish Transport Infrastructure Agency
Country
Finland
Partner
Mipro
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
RSR123, FAdC®
Protocols
Frauscher Safe Ethernet FSE
Year
2019
Scope of project
275 sensors on open line 75 sensors in Ylivieska station

Frauscher supplied one of Finland’s busiest railway lines with new axle counters. The line was extended from a single to a double track section and Mipro was looking for a solution which can interface with their interlocking system in an efficient and cost effective way. Other important criteria was a minimum maintenance requirement and outdoor equipment which can cope with the harsh environmental conditions in Finland.

The railway section between Kokkola and Ylivieska is one of Finland’s busiest lines where trains reach up to 200 km/h. Environmental conditions in Finland are harsh: heavy snow and extreme cold temperatures are common during winter.

The Finnish Transport Agency planned to extend the railway section between Kokkola and Ylivieska from a single to a double track section. This project was one of the most comprehensive signalling system projects ever conducted in Finland. Obviously, the project needed to be performed without affecting the regular train operation.

The Frauscher Wheel Sensor RSR123 has proven its reliability even under harshest environmental conditions and combined with the Frauscher Advanced Counter FAdC®, it was the system of choice for this project. This combination allows to detect high speed trains under the very demanding environment given on this line. Using the Frauscher Safe Ethernet FSE protocol significantly sped up the installation and reduced the costs for the entire project. Based on training, the customer was able to configure the system by themselves – thanks to the open interfaces and configuration process.

Saving costs by realising mixed architectures

The FAdC® indoor equipment is located in numerous signaling shelters along the track. This saves massive costs in terms of cabling requirements due to short distances from the sensor to the evaluation board.

System status always on screen

The Frauscher Diagnostic System FDS allows remote access to valuable data for planning and conduction of preventive and predictive maintenance work.

Similar Projects
This might also interest you
1/5
Train DetectionCanada

Toronto Transit Commission

The Toronto Transit Commission (TTC) Line 1 Yonge-University is Toronto’s longest subway line, with track circuits utilized for signalling. Due to an increasing number of daily passengers and an aged system the need for upgrading without interfering with the daily operations became readily apparent. It was further required that the new signalling system functions independently of the existing system. It would provide CBTC fallback functionalities, and work as an overlay to the current track circuit-based system.
Train DetectionUnited Kingdom of Great Britain and Northern Ireland

Maintaining the past, creating the future

The Dean Forest Railway (DFR) operates a historical 7 km passenger service line running north from Lydney Junction to Parkend, in the Forest of Dean. Due to extensions of the line and an additional turnout being added at Parkend, an update and modernisation of the existing train detection and signalling system was necessary. Being a heritage railway, it requires high standards in terms of signalling and safety, whilst maintaining the historical touch of the line.
Train Detection, ServicesUnited Kingdom of Great Britain and Northern Ireland

Cutting delays through data-driven maintenance

Frauscher has supported the Paddington project with the adoption of Frauscher Insights Diagnostics, a cloud-based monitoring solution that increases data usefulness and availability. By providing faster fault analysis and health messages, Frauscher Insights has helped Network Rail improve reliability, reduce downtime and delay minutes by up to 80%, and shift towards a proactive maintenance approach.
Train DetectionIndia

Ensuring reliable rail operations across India´s longest rail-road bridge

The Bogibeel Bridge is India’s longest rail-road bridge that connects Assam and Arunachal Pradesh, carrying both rail and road traffic across the Brahmaputra River. Harsh environmental conditions and structural constraints made conventional signalling unworkable. The Frauscher Advanced Counter FAdC® axle counting system was selected for its proven reliability and low maintenance under these challenging conditions.
Train DetectionIndia

Western Dedicated Freight Corridor (Rewari – Makarpura)

The Western Dedicated Freight Corridor (WDFC) represents one of the most strategically significant freight transportation projects in India. By facilitating the seamless transport of goods between major economic hubs, the intention is that the WDFC will significantly boost economic growth and development in the local region and beyond, further underlying the importance of this project.