Jhansi - Bina Railway Line | India
train-detectionIndia

Jhansi - Bina Railway Line | India

Operator
Indian Railways – North Central Railway
Country
India
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
FAdC®, RSR180
Year
2017
Scope of project
221 counting heads, 148 track sections

The Jhansi-Bina railway line is a strategically important line which belongs to North Central Railway and is in Uttar Pradesh. Initially, the line featured analogue axle counters for detecting trains in individual track sections as well as a DC track circuit train detection system in less congested areas.

Eventually, there was a requirement to get them replaced with the Frauscher Advanced Counter FAdC®. This project is one of Frauscher’s iconic Indian Railway projects, featuring 221 counting heads and 148 track sections.

In this project, the FAdC® indoor electronics were placed in 19 stations and 15 block huts, and all 34 are connected over an Ethernet based redundant network, in a distributed architecture.

The wheel sensors were mounted onto the rail with the patented Frauscher Rail Claw which makes the installation process easy and convenient, since no drilling is required. In turn, this preserves the structural integrity of the rail, saves costs, and reduces the dwell time on track for the installation engineers. Additionally, the distributed architecture used in this project minimises setup costs and enhances scalability in an efficient and cost-effective way.

Increasing Availability

COM redundancy, PSC redundancy & network redundancy with bus architecture for very high availability.

Easy and Cost effective Integration

Greater cost saving due to distributed architecture and lower maintenance requirement.

Similar Projects
This might also interest you
1/5
train-detectionSerbia

Hungary-Serbia Railway Project | Serbia

The Hungary-Serbia Railway Project is an iconic project of the “One Belt One Road” Initiative between China and CEE countries. Frauscher provides not only high-quality solutions but also detailed technical support and clarification.
train-detectionSpain

Three-rail Castellbisbal | Spain

The dual-gauge system of the Spanish railway network is quite challenging in terms of track vacancy detection: Wheel sensors must be installed on two rails next to each other in tight spaces and have to detect axles reliably on the respective rail. Frauscher developed a solution which copes also with the complexity of different interlocking technology in the stations along the line.
data-transmissionUnited Kingdom of Great Britain and Northern Ireland

Headbolt Lane to Rainford Project | United Kingdom

As part of the project to expand Merseyrail services, the operator needed to address the challenge of transmitting indication information over a specific section, spanning from Headbolt Lane to Rainford. In this instance, Frauscher’s technology was utilised to fulfill the data transmission requirements of this project, avoiding expensive and time consuming cabling that would have otherwise been required.
train-detectionUnited Kingdom of Great Britain and Northern Ireland

London to Corby | UK

The project was part of Network Rail’s Midland Main line electrification programme and involved re-signalling between Bedford and Kettering. The goal is the reduction of industry costs and environmental benefits through lighter rolling stock, reduced fuel costs and lower carbon emissions.
train-detectionUnited States of America

Frauscher Track Vacancy System FTVS Testing | USA

During the initial development phase of the Frauscher Track Vacancy System FTVS, a number of pre-production units were released for real-world testing to examine their performance in typical yard environments. Consequently, several trials were conducted in the United States.