Hungary-Serbia Railway Project | Serbia
train-detectionSerbia

Hungary-Serbia Railway Project | Serbia

Operator
JSC Serbian Railway
Country
Serbia
Partner
CRSC
Segment
Main & Regional Line
Application
Track Vacancy Detection
Products
RSR123, FAdC®
Protocols
Frauscher Safe Ethernet FSE
Year
2019

The Hungary-Serbia Railway Project is an iconic project of the “One Belt One Road” Initiative between China and CEE countries. Frauscher provides not only high-quality solutions but also detailed technical support and clarification.

The Hungary-Serbia Railway Project is an iconic project of the “One Belt One Road” Initiative between China and CEE countries. The railway runs from Belgrade, Serbia to Budapest, Hungary, spanning a total of 341.7 km. The project is taking place in Serbia. Currently, the section from Belgrade to Nov Sad has been put into operation in March 2022, with a maximum operating speed of 200km/h.

Frauscher supplied the Frauscher Advanced Counter FAdC® for this project, using the Frauscher Safe Ethernet FSE protocol. The wheel sensor RSR123 installed on the trackside proves a robust ability to EMI by its V.mix Technology® patent. Its pluggable cable also makes it easier to install and replace. Both the indoor and outdoor equipment significantly speed up the installation and reduced the costs for the entire project.

The transcontinental railway requires Chinese railroad equipment that aligns with the ETCS-L2 train control system standards of Europe and the Certificate of Technical Specification for Interoperability (TSI), a new requirement for Chinese equipment in the rail signalling field.

Frauscher has cooperated with China Railway Signal & Communication Group (CRSC) for 15 years. As an Austrian brand in the Chinese market, the Frauscher China team, Austrian headquarters, and CEE team worked closely together to play an indispensable role as a link between China and Europe in the process of aligning signalling technology standards, providing technical clarification support for customers to attain the TSI certificates and Serbian country approval.

Flexible configuration options

Frauscher Advanced Counter FAdC® is able to communicate with higher-level interlocking system via safety protocols, such as customized protocols and Frauscher Safety Ethernet FSE which is used in this project.

Highly resistant to electromagnetic interferences

Wheel Sensor RSR123 has a high ability to resist the EMI with its V.Mix Technology® patent. Its pluggable cable and Frauscher Rail Claw SK150 significantly reduce installation and maintenance costs.

Exhaustive technical service

Frauscher provides not only high-performance products but also detailed technology clarification and on-site training.

Similar Projects
This might also interest you
1/5
data-transmissionUnited Kingdom of Great Britain and Northern Ireland

Headbolt Lane to Rainford Project | United Kingdom

As part of the project to expand Merseyrail services, the operator needed to address the challenge of transmitting indication information over a specific section, spanning from Headbolt Lane to Rainford. In this instance, Frauscher’s technology was utilised to fulfill the data transmission requirements of this project, avoiding expensive and time consuming cabling that would have otherwise been required.
train-detectionIndia

Vijayawada – Gannavaram Rail Line | India

The Vijayawada – Gannavaram rail line belongs to South Central Railway and is situated in Andhra Pradesh. Initially, the line featured a conventional signalling system and there was a requirement by the operator to update this into an automatic signalling system with the Frauscher Advanced Counter FAdC®.
train-detectionChina

Tram Huangpu Line 1 | China

Tram Huangpu Line 1 (HP1) line is located in urban areas with high traffic density and passenger volume as well as many level crossings. The adverse weather conditions can cause flooding of the track bed and add to the challenges for reliable system availability and operations.
train-detectionSpain

Three-rail Castellbisbal | Spain

The dual-gauge system of the Spanish railway network is quite challenging in terms of track vacancy detection: Wheel sensors must be installed on two rails next to each other in tight spaces and have to detect axles reliably on the respective rail. Frauscher developed a solution which copes also with the complexity of different interlocking technology in the stations along the line.
train-detectionCanada

Toronto Transit Commission | Canada

The Toronto Transit Commission (TTC) Line 1 Yonge-University is Toronto’s longest subway line, with track circuits utilized for signalling. Due to an increasing number of daily passengers and an aged system the need for upgrading without interfering with the daily operations became readily apparent. It was further required that the new signalling system functions independently of the existing system. It would provide CBTC fallback functionalities, and work as an overlay to the current track circuit-based system.